Construction of the Lockwood 2 Observatory, Descanso, CA Photo credits: Scott, Behyar, Mike Return to Main Observatory Page
|
Site Survey: 11-3-21 |
Concrete Pour: 12-18-21 |
After the Pour: 12-18-22 |
Trenching Electrical Conduits to Site: 1-6-22 |
Floor and Frame: 1-24-22 |
Installing Piers: 2-12-22 |
Leveling the Pier: 2-12-22 |
Tapping holes for mount plates: 2-12-22 |
Roofers: 2-12-22 |
Floor,
Frame, Walls and Roof: 3-7-22 |
Interior painting: 4-9-22 |
Project Complete: 4-14-22 |
The Crew: Scott, Mike, Behyar, Bob : 4-14-22 |
Connecting power lines: 4-24-22 |
Our Official Address |
Roof Open: First Light 4-29-22 |
Twin DSIs: 4-29-22 |
Control
Room at Night: 4-30-22 |