Site Survey: 11-3-21
Concrete Pour:  12-18-21
After the Pour: 12-18-22
Trenching Electrical Conduits to Site: 1-6-22
Floor and Frame:  1-24-22
Installing Piers: 2-12-22
Leveling the Pier: 2-12-22
Tapping holes for mount plates: 2-12-22
Roofers: 2-12-22
Floor, Frame, Walls and Roof: 3-7-22

Interior painting: 4-9-22
Project Complete: 4-14-22
The Crew: Scott, Mike, Behyar, Bob : 4-14-22
Connecting power lines: 4-24-22

Our Official Address
Roof Open: First Light 4-29-22

Twin DSIs: 4-29-22